Load study and site survey.
We measure or reconstruct the real load profile, peaks, troughs, harmonics, and ambient conditions, before selecting anything.

We log the load on site, then calculate autonomy and produce the single-line drawing and specification.

We measure or reconstruct the real load profile, peaks, troughs, harmonics, and ambient conditions, before selecting anything.
Battery, UPS, and BESS sizing to autonomy, temperature, and cycle targets. Lead-acid, TPPL, or lithium chosen for the duty, not the invoice.
Single-line diagrams, equipment schedules, bill of materials, and commissioning plan, enough that any competent contractor could build to spec.
Last reviewed: