EXBATT
    EXBATT
    Data center aisle with server racks.
    Sectors / Data Centers

    UPS and batteries for data centres

    Modular UPS, battery rooms and scheduled load-bank testing for server rooms and data halls.

    Redundant UPS trains.

    N+1 or 2N modular UPS with parallel redundancy and hot-swappable modules. Sized for real IT load growth, not brochure claims.

    Battery rooms.

    VRLA, TPPL, or lithium, chosen for footprint, autonomy, and lifecycle cost. Racking, ventilation, containment, and monitoring engineered as a system.

    Testing and reporting.

    Load-bank discharge and impedance testing on a schedule you agree with your auditors. Every result documented, trended, and actionable.

    Frequently asked

    How much battery autonomy does a data hall need?
    Where a generator is installed, 5 to 10 minutes is normally enough to cover start and transfer with margin. Without a generator, autonomy is set by how long an orderly shutdown or a workload migration takes.
    N+1 or 2N redundancy?
    N+1 covers the failure or maintenance of one module and suits most enterprise halls. 2N gives two independent paths end to end and is chosen where the service level allows no single shared component.
    How often should data center batteries be tested?
    Impedance trending quarterly to half yearly, a capacity discharge test at commissioning and then annually, and string replacement planned once measured capacity approaches 80 percent of rating.

    Related

    Last reviewed:

    Not sure which fits?

    Tell us the load, the site, and the constraints. We'll size the right system.