At a glance
Location: Albania.
Sector: ManufacturingUse case: Peak shaving + ride-throughBasis of design: Metered load profileScope: Study, supply, EPC
The site had two separate problems, expensive demand peaks and short interruptions that spoiled production batches. One system addressed both.
Location: Albania.
Reduce billed demand peaks and protect sensitive process loads from short grid interruptions, without changing the production schedule.
Metering first. The load profile decided the power and energy rating, and the control strategy was written before the equipment was selected.
Demand peaks are held below the agreed limit by the control strategy, and short interruptions no longer reach the sensitive process loads.