At a glance
Location: Albania.
Storage sized from metered load data, not from a supplier catalogue, to cut demand peaks and ride through short interruptions.
Location: Albania.
Reduce billed demand peaks and protect sensitive process loads from short grid interruptions, without changing the production schedule.
Metering first. The load profile decided the power and energy rating, and the control strategy was written before the equipment was selected.
Demand peaks are held below the agreed limit by the control strategy, and short interruptions no longer reach the sensitive process loads.