At a glance
Location: Kosova.
Sector: Data centreTopology: Modular, N+1Constraint: No load on raw mainsScope: Supply, install, commission
The upgrade constraint was not capacity. It was doing the work without ever putting the IT load on raw mains.
Location: Kosova.
Replace an end-of-support monolithic UPS serving a live data hall, improve serviceability, and keep redundancy through the transition.
A temporary protected path, then a modular system installed alongside and loaded progressively before the old unit was isolated.
Capacity can now be added a module at a time, and routine service no longer requires putting the hall on bypass.