    Data hall, modular UPS upgrade

    The upgrade constraint was not capacity. It was doing the work without ever putting the IT load on raw mains.

    At a glance

    Location: Kosova.

    Sector: Data centreTopology: Modular, N+1Constraint: No load on raw mainsScope: Supply, install, commission

    The brief

    Replace an end-of-support monolithic UPS serving a live data hall, improve serviceability, and keep redundancy through the transition.

    What we delivered

    A temporary protected path, then a modular system installed alongside and loaded progressively before the old unit was isolated.

    • Modular UPS with hot-swappable power modules for future service without downtime
    • Battery autonomy verified by discharge test at commissioning
    • Bypass and switching procedure written and rehearsed before execution

    Outcome

    Capacity can now be added a module at a time, and routine service no longer requires putting the hall on bypass.