At a glance
Location: Kosova.
Power: 200 kWAutonomy: 1 hourBatteries: Lead-acid bank, three-tier rackSite: Call centre

When the grid drops, every desk and server keeps running for a full hour.

The installation, as delivered.
Central UPS | 200 kW | 1 h autonomy | call centre. Installed and commissioned by EXBATT.

Location: Kosova.
A 200 kW UPS cabinet, a battery bank sized for one hour on a three-tier rack, and the DC disconnect and cabling to the building.